AZER RAILROADS, REHABILITATION STUDY REPORT FOR MULTIPLE STRUCTURES
Home / AZER RAILROADS, REHABILITATION STUDY REPORT FOR MULTIPLE STRUCTURES
PROJECT HIGHLIGHTS
Evaluation of the perfomance of existing railway bridges of various types (steel, reinforced concrete and pre-stressed) located on Azer Railways’ Elet-Osmanlı and Osmanlı-Qasımlı lines.
On-site condition inspections for each bridge to document the member and reinforcement detorirations later to be used for assessment purposes.
Performed advanced structural analysis for each bridge to determine their perfomance under dead loads, live(rail) loads and earthquake loads.
Assessment for the remaining service life of each bridge in regards to their current condition determined through site inspections and computer based structural anlysis.
Detailed rehabilitation and strucutural study reports for 12 bridges in total.