PROJECT HIGHLIGHTS

  • Final and complete design of all engineering structures (viaducts, bridges, culverts, retaining walls, tunnels) on Cerkezkoy-Subası Highway project (approximately 50 km long).
  • Determined the structural member dimensions and reinforcement requirements to meet the demands of a high seismicity region.
  • Analysis for the response via creating full scale models in a highly seismic region for each structure and quantification of the structural requirements with respect to national and international standards & specifications.
  • Detailed design drawings and calculation reports for various structure types (including: prestressed girder viaducts and bridges, box sectioned culverts and underpasses, reinforced concrete retaining walls, cut-cover tunnels etc.).
Most Recent Projects