PROJECT HIGHLIGHTS

  • Provided technical consultancy services throughout the construction phase of a 250m long stone masonry arch bridge crossing Dicle River.
  • Evaluation of the calculation reports, field tests and detailed drawings prepared by the designer, and recommandation of alternative solutions for the ease, speed and cost advantages of construction.
  • Guided the designer throughout the design phase by pointing out the shortcomings and avoided unecessary delays by recommanding practical solutions.
  • Monthly project review reports for documentation of up to date condition of the project.
Most Recent Projects